NOX test failure with intel 16
Created by: bmpersc
The NOX_Thyra_Heq_MPI_1 test is failing when built with intel 16. You can view the issue at:
http://testing.sandia.gov/cdash/testDetails.php?test=35003382&build=2588884
In case that link is dead the full test output is:
Teuchos::GlobalMPISession::GlobalMPISession(): started processor with name ascic114 and rank 0! Verbosity Disabled
-- Nonlinear Solver Step 0 -- ||F|| = 7.483e+00 step = 0.000e+00
-- Nonlinear Solver Step 1 -- ||F|| = 3.870e+00 step = 1.000e+00
R condition number estimate (1) = 1
-- Nonlinear Solver Step 2 -- ||F|| = 1.258e+00 step = 1.000e+00
R condition number estimate (2) = 18.4928
-- Nonlinear Solver Step 3 -- ||F|| = 1.425e-01 step = 1.000e+00
R condition number estimate (3) = 70.5281
-- Nonlinear Solver Step 4 -- ||F|| = 1.046e-01 step = 1.000e+00
R condition number estimate (4) = 246.764
-- Nonlinear Solver Step 5 -- ||F|| = 5.352e-02 step = 1.000e+00
R condition number estimate (5) = 13080.7
-- Nonlinear Solver Step 6 -- ||F|| = 4.603e-02 step = 1.000e+00
R condition number estimate (6) = 1.13873e+07
-- Nonlinear Solver Step 7 -- ||F|| = 2.390e-02 step = 1.000e+00
R condition number estimate (7) = 3.72767e+07
-- Nonlinear Solver Step 8 -- ||F|| = 1.629e-02 step = 1.000e+00
R condition number estimate (8) = 1.18295e+08
-- Nonlinear Solver Step 9 -- ||F|| = 4.299e-03 step = 1.000e+00
R condition number estimate (9) = 8.85506e+09
-- Nonlinear Solver Step 10 -- ||F|| = 6.883e-03 step = 1.000e+00
R condition number estimate (10) = 6.14489e+11
-- Nonlinear Solver Step 11 -- ||F|| = 2.672e-04 step = 1.000e+00
R condition number estimate (10) = 7.16014e+12
-- Nonlinear Solver Step 12 -- ||F|| = 1.350e-04 step = 1.000e+00
R condition number estimate (10) = 7.37544e+13
-- Nonlinear Solver Step 13 -- ||F|| = 2.239e-05 step = 1.000e+00
R condition number estimate (10) = 1.7291e+13
-- Nonlinear Solver Step 14 -- ||F|| = 1.087e-05 step = 1.000e+00
R condition number estimate (10) = 5.91806e+12
-- Nonlinear Solver Step 15 -- ||F|| = 1.329e-06 step = 1.000e+00
R condition number estimate (10) = 2.41392e+12
-- Nonlinear Solver Step 16 -- ||F|| = 8.775e-08 step = 1.000e+00 (Converged!)
-- Final Status Test Results -- Converged....OR Combination -> **...........Finite Number Check (Two-Norm F) = Finite Converged....AND Combination -> Converged....F-Norm = 4.387e-09 < 1.000e-08 (Length-Scaled Two-Norm, Absolute Tolerance) Converged....WRMS-Norm = 3.489e-05 < 1 ??...........Number of Iterations = -1 < 100
-- Nonlinear Solver Step 0 -- ||F|| = 7.483e+00 step = 0.000e+00
-- Nonlinear Solver Step 1 -- ||F|| = 3.870e+00 step = 1.000e+00
R condition number estimate (1) = 1
-- Nonlinear Solver Step 2 -- ||F|| = 1.258e+00 step = 1.000e+00
R condition number estimate (2) = 18.4928
-- Nonlinear Solver Step 3 -- ||F|| = 1.425e-01 step = 1.000e+00
R condition number estimate (3) = 70.5281
-- Nonlinear Solver Step 4 -- ||F|| = 1.046e-01 step = 1.000e+00
R condition number estimate (4) = 246.764
-- Nonlinear Solver Step 5 -- ||F|| = 5.352e-02 step = 1.000e+00
R condition number estimate (5) = 13080.7
-- Nonlinear Solver Step 6 -- ||F|| = 4.603e-02 step = 1.000e+00
R condition number estimate (6) = 1.13873e+07
-- Nonlinear Solver Step 7 -- ||F|| = 2.390e-02 step = 1.000e+00
R condition number estimate (7) = 3.72767e+07
-- Nonlinear Solver Step 8 -- ||F|| = 1.629e-02 step = 1.000e+00
R condition number estimate (8) = 1.18295e+08
-- Nonlinear Solver Step 9 -- ||F|| = 4.299e-03 step = 1.000e+00
R condition number estimate (9) = 8.85506e+09
-- Nonlinear Solver Step 10 -- ||F|| = 6.883e-03 step = 1.000e+00
R condition number estimate (10) = 6.14489e+11
-- Nonlinear Solver Step 11 -- ||F|| = 2.672e-04 step = 1.000e+00
R condition number estimate (10) = 7.16014e+12
-- Nonlinear Solver Step 12 -- ||F|| = 1.350e-04 step = 1.000e+00
R condition number estimate (10) = 7.37544e+13
-- Nonlinear Solver Step 13 -- ||F|| = 2.239e-05 step = 1.000e+00
R condition number estimate (10) = 1.7291e+13
-- Nonlinear Solver Step 14 -- ||F|| = 1.087e-05 step = 1.000e+00
R condition number estimate (10) = 5.91806e+12
-- Nonlinear Solver Step 15 -- ||F|| = 1.329e-06 step = 1.000e+00
R condition number estimate (10) = 2.41392e+12
-- Nonlinear Solver Step 16 -- ||F|| = 8.775e-08 step = 1.000e+00 (Converged!)
-- Final Status Test Results -- Converged....OR Combination -> **...........Finite Number Check (Two-Norm F) = Finite Converged....AND Combination -> Converged....F-Norm = 4.387e-09 < 1.000e-08 (Length-Scaled Two-Norm, Absolute Tolerance) Converged....WRMS-Norm = 3.489e-05 < 1 ??...........Number of Iterations = -1 < 100
Test failed!
Primary job terminated normally, but 1 process returned
a non-zero exit code.. Per user-direction, the job has been aborted.
mpiexec detected that one or more processes exited with non-zero status, thus causing the job to be terminated. The first process to do so was:
Process name: [[3455,1],0]